AT&T FIBER OPTIC CABLE REPLACEMENT PROJECT
Environmental Assessment/Mitigated Negative Declaration


Final Document
  Responses to Comments  
    Comment Set A  
    Comment Set B  
    Comment Set C  
    Comment Set D  
    Comment Set E  
    Comment Set F  
    Comment Set G  

  Revised Sections  
    4.1 Soils and Geology  
    4.3 Vegetation  
    4.4 Wildlife  
    4.5 Invasive and Noxious Weeds  
    4.8 Surface and Groundwater  
    5.0 Cumulative Impacts  
    6.0 Mitigation Monitoring, Compliance, and Reporting Program  

Draft Document
  Notice of Intent to Adopt a Mitigated Negative Declaration  

  Cover Page  
  BLM Mission Statement  
  Table of Contents  
  Acronyms and Abbreviations  

  1.0 Introduction  
      Figure 1-1: Project Overview Map  

  2.0 Proposed Project and Alternatives  
      Figure 2-1: Route Map - Segment 1  
      Figure 2-2: Route Map - Segment 2  
      Figure 2-3: Route Map - Segment 3 (1 of 2)  
      Figure 2-3: Route Map - Segment 3 (2 of 2)  
      Figure 2-4: Access Vault Typical Drawing  

  3.0 Public Scoping and Issue Identification  

  4.0 Affected Environment, Impacts, and Mitigation  
    4.1 Soils and Geology  
    4.2 Visual Resources  
      Figure 4.2-1: Scenic Resources Map  
    4.3 Vegetation  
    4.4 Wildlife  
    4.5 Invasive and Noxious Weeds  
    4.6 Noise  
    4.7 Air Quality  
    4.8 Surface and Groundwater  
    4.9 Health and Safety/Hazardous Materials  
    4.10 Cultural Resources  
    4.11 Environmental Justice  
    4.12 Transportation  
    4.13 Recreation  
    4.14 Utilities  

  5.0 Cumulative Impacts  

  6.0 Mitigation Monitoring, Compliance, and Reporting Program  

  7.0 Consultation and Coordination  

  8.0 References  

  Attachments  
    Attachment A - CEQA Checklist  
--
    Attachment B - Representative Photographs  
--

  Appendices  

    Appendix A - Biological Evaluation  
--
      Appendix A - Figures  
                Part 1 of 5  
--
                Part 2 of 5  
--
                Part 3 of 5  
--
                Part 4 of 5  
--
                Part 5 of 5  
--
      Appendix B - Site Photographs  
--
      Appendix C - Jurisdictional Delineation  
--
                Figure 1 of 3  
--
                Figure 2 of 3  
--
                Figure 3 of 3  
--
                Attachment A - Field Data Sheets  
--
                Attachment B - Delineation Maps  
                          Map 1 of 10  
--
                          Map 2 of 10  
--
                          Map 3 of 10  
--
                          Map 4 of 10  
--
                          Map 5 of 10  
--
                          Map 6 of 10  
--
                          Map 7 of 10  
--
                          Map 8 of 10  
--
                          Map 9 of 10  
--
                          Map 10 of 10  
--
                Attachment C - Site Photos  
                          Part 1 of 3  
--
                          Part 2 of 3  
--
                          Part 3 of 3  
--
      Appendix D - Desert Tortoise Focused Surveys  
--
                Appendix A - APNs and Township/Range/Section Numbers  
--
                Appendix B - Field Data Sheets  
                          Part 1 of 6  
--
                          Part 2 of 6  
--
                          Part 3 of 6  
--
                          Part 4 of 6  
--
                          Part 5 of 6  
--
                          Part 6 of 6  
--
                Appendix C - Site Photos  
--

    Appendix B - Mohave Ground Squirrel Habitat Assessment  
--

    Appendix C - Biological Opinion  
      Part 1 of 3  
--
      Part 2 of 3  
--
      Part 3 of 3  
--

    Appendix D - Noxious Weed Management Plan  
--
      Figure 1 of 3  
--
      Figure 2 of 3  
--
      Figure 3 of 3  
--

    Appendix E - Succulent Transplanting Plan  
--

    Appendix F - Cultural Resources Reports  
--
      Appendix A1 - NAHC Sacred Lands Search  
--
                Figure 1 of 3  
--
                Figure 2 of 3  
--
                Figure 3 of 3  
--
      Appendix A2 - NAHC Correspondence  
--

    Appendix G - Spill Prevention and Contingency Plan  
--
      Figure 1  
--

    Appendix H - Stormwater Pollution Prevention Plan  
--
      Appendix A - Notice of Intent  
--
      Appendix B - Permits  
                Part 1 of 5  
--
                Part 2 of 5  
--
                Part 3 of 5  
--
                Part 4 of 5  
--
                Part 5 of 5  
--
      Appendix C - Maps  
--
      Appendix D - Best Management Practices  
                Part 1 of 14  
--
                Part 2 of 14  
--
                Part 3 of 14  
--
                Part 4 of 14  
--
                Part 5 of 14  
--
                Part 6 of 14  
--
                Part 7 of 14  
--
                Part 8 of 14  
--
                Part 9 of 14  
--
                Part 10 of 14  
--
                Part 11 of 14  
--
                Part 12 of 14  
--
                Part 13 of 14  
--
                Part 14 of 14  
--
      Appendix E - Inspection and Maintenance Form  
--
      Appendix F - Construction Schedule  
--
      Appendix G - Training Documents  
--
      Appendix H - Responsible Parties  
--
      Appendix I - Non-Compliance Report Form  
--
      Appendix J - Sampling and Analysis Form  
--
      Appendix K - SWPPP Amendment Log  
--
      Appendix L - Completed Inspection Forms  
--
      Appendix M - COI Form  
--

    Appendix I - HDD: Contingency and Resource Protection Plan  
--

    Appendix J - Security Plan  
--